Hydro Bridge and Tunnelling projects made easy with the MB Units

30-05-2022

A highly renowned hydro, bridge and tunnelling contractor from the Northern part of India, with an annual turnover in excess of ₹5,000 Crores found an ideal solution in BF90.3 for their aggregates requirements.

To more competitively diversify into Road Project & Pipe Line Work, they chose MB.


Will it work at my remote site location?

 

Remote jobsites imply several challenges 

Remote jobsites imply several challenges 

Our esteemed customer recently won a tender where they are required to undertake Bridge construction work in a very remote location in the Northern part of India. The project site was located in a very remote location in the hilly terrain where :

  • mobility of heavy equipment and trucks is difficult
  • electricity connection hard to obtain and sustain.

For their project, there is a significant requirement of 20mm down aggregates to prepare concrete and 40mm down to maintain the base strength. Concrete is being used to make the bridge.

The site being in a remote area had several challenges:

  • transportation cost for aggregates were coming excessively high
  • availability of the aggregate material at their site was scarce as the trucks were not filled to their optimum level due to un-even hilly terrain.
  • difficulty to install a stationary crusher due to inadequate land and scarcity of electricity.

How one excavator, one MB Crusher Unit and one operator can help you save more money?

 


One machine one operator, endless possibilities

Today, they have deployed Hyundai R215 excavator where they are crushing 20mm and 40mm down river bed material which is readily available at their project site, thus eliminating transportation cost by deploying BF90.3 crusher bucket on their Hyundai R215 Excavator.

With a single base machine and operator, they are running Crusher Bucket for approximately 10 hours per day, producing precise 20mm and 40mm down material as required for their project.

This led to significant reduction in the operating expenses and improved their overall project timelines.

Prior to securing this tender, they had deployed MB-R800 Drum Cutter in a Tunnel making project in the neighbouring site and also bought a BF60.1 Crusher Bucket for their hydro project in another location.

Being a very satisfied customer with the product and support, customer had once again entrusted MB Crusher for their project requirements.