PLEASANTLY CRUSHING THROUGH SIBU – MALAYSIA
In Malaysia there are about 65.000 km of roads that connects to every state. And more will be done. The process of construction of a new road – whether from asphalt or concrete – requires the production of an excellently bonded pavement structure, beginning with a stable base layer and going all the way to a precisely levelled surface course.
Fairly easy steps that are too often left lingering. Although delays in competition of roads projects in developing countries is unacceptable, as it can cause undue inconvenience for the users.
To improve upon the situation, in Malaysia, exhaustively studies have been done to identify the problems faced by contractors and reasons behind the many requests of extension of times in road construction.
To improve upon the situation, in Malaysia, exhaustively studies have been done to identify the problems faced by contractors and reasons behind the many requests of extension of times in road construction. Thoughtful investigations have pinpointed the following challenges: lack of materials, lack of workers, change of design, financial problems and lack of machinery.
Problems faced by contractors till recently, when an MB Crusher Bucket BF90.3 S4 mounted on a Hyundai 210 LC-7 has managed solved all of them. Permitting to pleasantly cruise through Sibu roads.
Materials are now outsourced at the site, one machine- one operator only is needed, excavators are easy to maneuver and transport around and last but not list the innovative MB Crusher Bucket is cost- effective.
Every country in the world constantly need to improve roads as catalyst for the local economy, MB Crusher units are largely available worldwide, get in touch to get the unit suitable for your machine today.